Skip to content
Mandate SA — home

Organ of state

Harry Gwala District Municipality

Tender notices
35
Awards as supplier
0
Award values unverified
—
Projects owned
0

Tender notices

As the portal lists them

  • HGDM 816/HGDM/2023

    PANEL OF THREE (3) PROFESSIONAL SECURITY SERVICE PROVIDERS: APPOINTMENT FOR THE PROVISIONING OF SECURITY SERVICES FOR THE PREMISES OF THE HARRY GWALA DISTRICT MUNICIPALITY OFFICES AND OTHER MUNICIPAL SITES FOR A PEROID OF 36 MONTHS

  • HGDM 815/HGDM/2023

    KHUKHULELA WATER SUPPLY PHASE 2: CONSTRUCTION OF 1ML COMMAND RESERVOIR RC

  • HGDM 812/HGDM/2023

    GREATER SUMMERFIELD WATER SCHEME: REFURBISHMENT AND UPGRADE OF THE GREATER SUMMERFIELD ABSTRACTION WORKS AND PUMPSTATION WITHIN HARRY GWALA DISTRICT MUNICIPALITY

  • HGDM 814/HGDM/2023

    CREIGHTON WATER SUPPLY PHASE 2: CONSTRUCTION OF 1.4KM LONG 350mm DIAMETER RISING MAIN PIPELINE AND 1.4 KM 300mm DIAMETER CLEAR WATER GRAVITY MAIN BETWEEN CENTOCOW-UMZIMKHULU RIVER ABSTRACTION WORKS AND CENTOCOW WTW

  • . HGDM 813/HGDM/2023

    CREIGHTON WATER SUPPLY PHASE 2: CONSTRUCTION OF CENTOCOW – UMZIMKHULU RIVER ABSTRACTION WORKS: INTAKE CHAMBER, GALVANISED STEEL TANK SUMP, HIGH-LIFT PUMP STATION, AND INSTALLATION OF ASSOCIATED MECHANICAL AND ELECTRICAL WORKS

  • HGDM 798/HGDM/2022

    RECTIFICATION AND UPGRADE OF FAIRVIEW AND IXOPO TOWN SEWER SYSTEM.

  • HGDM 752/HGDM/2021

    PROVISION OF SERVER ROOM AND DATA CENTRE MAINTENANCE SERVICES FOR A PERIOD OF 36 MONTHS.

  • HGDM 775/HGDM/2022.

    PANEL OF TWO SERVICE PROVIDERS: SUPPLY AND DELIVERY OF PLUMBING MATERIALS FOR A PERIOD OF 36 MONTHS.

  • HGDM788/HGDM/2022

    IBISI SEWER RETICULATION: Construction of approximately 24KM of sewer main and 334 connections with toilet top structures and plumbing connection

  • HGDM796/HGDM/2022

    MAZIZINI WATER SUPPLY SCHEME CONSTRUCTION OF RETICULATION NETWORK AND COMMUNAL STANDPIPES

  • HGDM795/HGDM/2022

    MAZIZINI WATER SUPPLY SCHEME DRILLING AND EQUIPPING OF BOREHOLES, CONSTRUCTION OF RISING MAINS, STORAGE TANKS, PUMPSTATIONS AND ASSOCIATED WORKS

  • HGDM790/HGDM/2022

    HHOSTELA MNCWEBA / MALENGE WATER SUPPLY SCHEME - DRILLING AND EQUIPPING OF BOREHOLES, CONSTRUCTION OF RISING MAINS, STORAGE TANKS AND ASSOCIATED WORKS AT MALENGE, KWADEDA, ESINTOLWENI AND NOZIYINGILA VILLAGES

  • HGDM789/HGDM/2022

    HHOSTELA MNCWEBA / MALENGE WATER SUPPLY SCHEME - DRILLING AND EQUIPPING OF BOREHOLES, CONSTRUCTION OF PUMPHOUSES, WATER STORAGE, RETICULATION NETWORK AND COMMUNAL STANDPIPES AT MNCWEBA, HOSTELA AND BOVINI VILLAGES

  • HGDM797/HGDM/2022

    NOKWEJA – MASHUMI WATER SUPPLY SCHEME PHASE 4 DRILLING AND EQUIPPING OF BOREHOLES, CONSTRUCTION OF RISING MAINS, PUMPSTATIONS AND ASSOCIATED WORKS

  • HGDM791/HGDM/2022

    REFURBISHMENT/AUGMENTATION OF GUDLUCINGO/EBHAYI WATER SUPPLY SCHEMES -CONSTRUCTION OF 6.400 KM 75mm DIA. uPVC GRAVITY MAIN PIPELINE, DRILLING AND EQUIPPING OF BOREHOLES FOR GUDLUCINGO VILLAGE

  • HGDM792/HGDM/2022

    REFURBISHMENT/AUGMENTATION OF GUDLUCINGO/EBHAYI WATER SUPPLY SCHEMES - CONSTRUCTION OF 1 KM 75mm DIA. uPVC GRAVITY MAIN PIPELINE, DRILLING, REFURBISHMENT OF EXISTING INFRASTRUCTURE AND EQUIPPING OF BOREHOLES FOR EBHAYI VILLAGES

  • HGDM 800/HGDM/2022

    PROVISION OF ICT CYBER SECURITY FOR A PERIOD OF 24 MONTHS.

  • HGDM801/HGDM/2022

    SUPPLY AND INSTALLATION OF THE DISASTER MANAGEMENT CENTRE COMMUNICATION AND INFORMATION SYSTEM FOR HARRY GWALA DISTRICT MUNICIPALITY

  • HGDM 782/HGDM/2022

    SUPPLY AND DELIVERY OF PERSONAL PROTECTIVE EQUIPMENT FOR A PERIOD OF 24 MONTHS

  • HGDM 781/HGDM/2022

    TRAVEL AGENT FOR A PERIOD OF 24 MONTHS

  • HGDM 770/HGDM/2022

    WATER SUPPLY TO MASAMINI - MBUZWENI INTERVENTION SCHEMES – EMMAUS, MBUZWENI, DIPHINI AND NDAWANA

  • HGDM 774/HGDM/2021

    KHUKHULELA WATER SUPPLY PROJECT PHASE TWO – MPUMULWANE VILLAGE. CONSTRUCTION OF 500KL STEEL TANK RESERVOIR, WATER TREATMENT PACKAGE PLANT AND RETICULATION AT MPUMULWANE.

  • HGDM 774/HGDM/2021

    KHUKHULELA WATER SUPPLY PROJECT PHASE TWO – MPUMULWANE VILLAGE. CONSTRUCTION OF 500KL STEEL TANK RESERVOIR, WATER TREATMENT PACKAGE PLANT AND RETICULATION AT MPUMULWANE.

  • HGDM 771/HGDM/2022

    GREATER SUMMERFIELD WATER SUPPLY SCHEME – CONSTRUCTION OF 2KM – 110MM DIA GRAVITY UPVC RETICULATION PIPELINE INFRASTRUCTURE IN MATHATHANE VILLAGE.

  • HGDM 772/HGDM/2022

    GREATER SUMMERFIELD WATER SUPPLY SCHEME – SHAMTO – CONSTRUCTION OF 13.1 8 KM 140 – 20MM DIA GRAVITY UPVC /HDPE RETICULATION PIPELINE INFRASTRUCTURE AND INSATALLATION OF 31 COMMUNAL STANDPIPES IN THORNBUSH – SHAMTO VILLAGE.

  • HGDM 768/HGDM/2022

    MARRISKOP WATER SUPPLY INTERVENTION SCHEMES – CONTRACT 2 FOR SWARTBERG, MARRIESKOP VILLAGES – CONSTRUCTION WATER SUPPLY INFRASTRUCTURE RETICULATION, BOREHOLES, RISING MAINS AND STANDPIPES..

  • HGDM 776/HGDM/2022

    PANEL OF 3 ELECTRICAL AND MECHANICAL SERVICES FOR A PERIOD OF 36 MONTHS AS AND WHEN REQUIRED

  • HGDM 778/HGDM/2022

    SUPPLY AND DELIVERY OF TREATMENT WORKS CHEMICALS FOR A PERIOD OF 36 MONTHS.

  • HGDM 777/HGDM/2022

    SUPPLY AND DELIVERY OF MOBILE TOILETS FOR A PERIOD OF 36 MONTHS.

  • HGDM 775/HGDM/2022

    PANEL OF 2 SERVICE PROVIDERS FOR THE SUPPLY AND DELIVERY OF PLUMBING MATERIALS FOR A PERIOD OF 36 MONTHS.

  • HGDM 779/HGDM/2022

    PANEL OF 2 SERVICE PROVIDERS FOR SUPPLY AND DELIVERY OF FUEL AND OIL FOR A PERIOD OF 12 MONTHS.

  • HGDM743/HGDM/2021

    DEVELOPMENT OF HARRY GWALA DISTRICT MUNICIPALITY BUSINESS CONTINUITY PLAN

  • HGDM 751/HGDM/2021

    PROVISION OF TRAINING IN FET CERTIFICATE: WATER PURIFICATION PROCESSES (48910) NQF L4 LEARNERSHIP FOR A PERIOD OF TWELVE (12) MONTHS

  • HGDM750/HGDM/2021

    COVID-19 PPE

  • HGDM 749/HGDM/2021

    PANEL OF 10 CONSULTING ENGINEERING SERVICES FOR TECHNICAL SUPPORT FOR VARIOUS INFRASTRUCTURE PROJECTS FOR A PERIOD OF THREE YEARS