Tender notice · eTender Publication Portal

For the Procurement of (1) Lot A Design, Engineering, Supply, Construction, Installation, testing and Commissioning of Battery Energy Storage Systems (BESS) with a minimum of 35MW/140 MWh of usable capacity and energy, including 5 Years Plants Operation and Maintenance Services and the associated Network Integration Equipment at Eskom Melkhout Substations. Koega Local Municipality, Eastern Cape, South Africa And (2) Lot B Design, Engineering, Supply, Construction, and Installation, testing and commissioning of a 2.04 MW Photovoltaic System, Battery Energy Storage Systems (BESS) with a minimum of 1.54 MW/6.16 MWh of usable capacity and energy including 5 Years Plant Operation and Maintenance Services, the associated Network Integration Equipment, Capacitor Banks on the Wessel Klipkop 22kV line, Telecommunications Equipment and a 33kV Loop In-Loop-Out Connection on the existing Rietfontein 33kV line including approximately 700m of new 33kV line to the new Mier Substation at Mier Rietfontein Near Rietfontein in the ZF Mgcawu District Municipality (Dawid Kruiper Local Municipality), Northern Cape Province, South Africa

The notice

Tender number
MWP1698WB
Organ of state
ESKOM
Advertised
2 December 2022
Closing
1 March 2023, 11:00 SAST
Briefing
none stated
Province
not stated
Submission
not electronic
OCDS id
ocds-3bc179af-8a4d-4aaf-bef4-95dd888f360b
Portal record
42505

Awards

From the portal's open-contracting release of this tender, as published

No award is published for a notice the portal lists as closed.

Contracts

Attached to an award in the release; a contract value is its own figure, not the award's