Organ of state
King Sabata Dalindyebo Local Municipality.
Also printed as: King Sabata Dalindyebo Local Municipality
- Tender notices
- 359
- Awards as supplier
- 0
- Award values unverified
- —
- Projects owned
- 0
Tender notices
The 50 most recent of 359
Panel of two (2) service providers for supply and delivery of office furniture for a period of three (3) years on an as and when required basis
Panel of two (2) service providers for supply and delivery of cleaning material for a period of two (2) years on an as and when required basis
Panel of six (06) contractors for building maintenance, alterations, extensions and new building structures for a period of three (03) years, as and when required. (Four (04) additional) (Re-advert)
ISDG Civil engineering men-tor services for a period of three (03) years
ISDG Electrical engineering mentor services for a period of three (03) years.
ISDG Town planning mentor services for a period of three (03) years.
Implementation of SD-WAN-VOIP-security services-server – network infrastructure and support solution, for a period of three (03) years.
Procurement of four (04) travel agency service providers for a period of three (03) years. (Re-advert) (Three (03) Additional)
Panel of four (04) service provider to supply and delivery cables, conductors and electrical material for a period of three years
Panel of three (03) advertising agencies for a period of two (02) years. (Re-advert)
Panel of thirteen (13) service providers for events management for a period of two (02) years. (Re-advert)
Upgrade and maintenance of Data Centre for a period of three (03) years. (Re-advert)
Panel of four (04) service provider for supply and delivery of transformers and mini substations for a period of three (03) years.
Panel of five (5) service providers to supply and deliver asphalt material for a period of three (03) years, as and when required.
Panel of five (05) Conveyancers to undertake conveyancing work for a period of three (03) years. (Re-advert).
Zimbane (Mandlovini) sports facility planning
Computer lifecycle management, tracking and recovery for a period of three (03) years
Implementation of the revised of GRAP 104 for the 2025/26 financial year.
Panel of service providers for the provision of catering services for a period of two (02) years.
Revaluation of Land and Buildings in terms of GRAP 17 and Valuation of Investment Properties in terms of GRAP 16 for the year ended 30 June 2026.
Panel of eight (08) electrical engineering consultants to provide professional engineering services for King Sabata Dalindyebo Municipality for a period of three (03) years. (Four additional) (Re-advert)
Supply and delivery of electrical toolboxes and electrical testing equipment for a period two (02) years. (Re-advert)
Panel of six (06) contractors for building maintenance, alterations, extensions and new building structures for a period of three (03) years, as and when required.
Supply, Installation, Testing, and Commissioning of the Schweitzer Engineering Laboratories (SEL- 487E) Protection Scheme for the 20 MVA 66/11 kV Transformer No. 3 at Unitra Substation, including H-Frame and Low Voltage (LV) Bus Support for a period of six (06) months Unitra Substation, including H-Frame and Low Voltage (LV) Bus Support for a period of six (06) months. (Re-advert)
Development of Electricity infrastructure database planning and design for a period four (04) months. (Re-advert)
Panel of three (3) service providers to supply and deliver of bitumen material for a period of two years. (Two additional) (Re-advert
Panel of thirteen (13) service providers for events management for a period of two (02) years
Panel of five (5) service providers for co-sourcing of the internal audit services, for a period of three (03) years, as and when needed. (Four additional) (Re-advert)
Panel of two (02) service providers to supply and deliver shearing shed equipment for a period of three (03) years. (One additional) (Re-advert)
Panel of three (03) advertising agencies for a period of two (02) years.
Conditional Assessment and unbundling of Infrastructure Assets for a period of twelve (12) Months.
Upgrade and maintenance of Data Centre for a period of three (03) years. (Re-advert)
Procurement of four (04) travel agency service providers for a period of three (03) years.
Panel of 5 five Conveyancers to undertake conveyancing work for a period of three (03) years
Supply & delivery of four À mobile VIP toilets – and 08 À mobile toilets. Once-Off RE-ADVERTISEMENT
Panel of 3 electrical contractors for new medium voltage/ low voltage installation work including direct customers on the KSD overhead and underground electrical network at various locations within KSDM for a period of three (03) years
CALL FOR PROPOSAL FOR THE DEVELOPMENT OF MQANDULI 500 UNITS-MIDDLE INCOME HOSING TOWNSHIP, FOR A PERIOD OF 36 MONTHS
Development of Electricity infrastructure database planning and design for a period four (04) months
Supply, Installation, Testing, and Commissioning of the Schweitzer Engineering Laboratories (SEL- 487E) Protection Scheme for the 20 MVA 66/11 kV Transformer No. 3 at Unitra Substation, including H-Frame and Low Voltage (LV) Bus Support for a period of six (06) months
Supply and delivery of electrical toolboxes and electrical testing equipment for a period two (02) years
Panel of twenty (20) service providers with a minimum of 4CE or higher CIDB grading for construction of unpaved roads and bridges for a period of three (03) years. Additional four (04) service providers.
Provision of banking services for a period of five (05) years
Implementation of digital signature solution
Development of integrated transport plan for a period of two (02) years.
Panel of eight (08) electrical engineering consultants to provide professional engineering services for King Sabata Dalindyebo Municipality for a period of three (03) years.
Supply and delivery of stationery for a period of two (02) years
Panel of four (04) service providers for supply and delivery of protective clothing for a period of two (02) years
Supply and installation of Council chamber recording system at Enkululekweni and Town hall sites with maintenance for a period of three (03) years
Development Of ICT Digital Transformation Strategy
Upgrade and maintenance of Data Centre for a period of three (03) years